The client orders 1,000 pieces. The factory ships 600 on Monday, then 400 on Thursday. When the second invoice is contested, the sales administration must be able to trace the invoice line back to the corresponding shipment. For an industrial mid-sized companies, the connection between EDI and billing is judged on this continuity.
Follow the reference rather than the screen
Choose a line, pick up order, item, quantity, shipment and invoice. Trace the identifiers in the ERP, EDI feed and invoice. Add a receipt gap, then have the problem investigated by the sales administration. The responsible person should know whether the error is from the partner, mapping or invoice issued, and identify the correction team.
The trace that has to cross the chain
- Command and command line
- Shipping message reference and quantity
- Receipt or deviation
- Line-related status return and invoice
Ask for a rehearsal with the two ICD teams
Present messages that remain within the scope of the EDITRUST and those that pass through DEMATRUST. Ask for a common support on the interface between the two, a way to link the incident to the business references and a contact person in case of incomplete data. In the call for tenders, use an architecture with two different suppliers to compare coordination and cost.

Why does partial delivery reveal the discrepancies?
Two sites can deliver a common order on different dates. Check that the invoice retains the correct order reference and that the teams find the lines concerned in case of rejection. A demonstration with a contextless bill often masks these difficulties.
What architectures compare?
- DEMATRUST and EDI ICD. Check the responsibilities between industrial trade and regulatory billing, then request a demonstration of a rejection. DEMATRUST
- Generix. Evaluate the connection of the invoice stream to the order and shipping references on your own messages. Generix Approved Platform
- Existing EDI and separate platform. Test the passage of identifiers between providers and the escalation of a cross-cutting incident. ICD hosted EDI
What evidence should I ask for from the support?
Ask who answers when the customer contests the receipt reference and who takes the invoice after correction. Include the scope of intervention, response times and coverage schedules in the proposal.
| Event | Identifier to be reconciled |
|---|---|
| Command | Customer number and line |
| Partial shipment | Reference of delivery and quantity |
| Equity | Invoice reference and reason |
How to articulate industrial EDI and electronic invoice?
Draw the chain from the customer order to the delivery and then to the invoice. Each event has a trade identifier. Line, command, and shipping references between the ERP, EDI and billing platform. When two providers are involved, define the path of diagnosis before opening the first incident.
Recipe for an industrial mid-sized companies
- Modified command
Change a quantity after receiving the initial message.
Prove that the ERP and the client are wearing the correct version.
- Partial delivery
Issue two shipping notices and two invoices on the same order.
Bring each line closer to the shipment concerned.
- Reference error
Insert a reference missing or erroneous.
Make the alert exploitable without losing the initial traces.
Example of a support contract
The factory team validates the reality of the shipment, the sales administration confirms the order and the ISD follows the message. Run an incident simulation with these three roles and the service providers. The partner must be able to say who is first and with what proof.
When to keep your current EDI operator?
If business flows are working and the connection to the new platform can be tested on real exchanges, keeping the operator can limit the risk of the project. Also compare the cost of shared responsibilities.
What references should be placed in the recipe sheet?
For each test, note the order number, item reference, line number, quantity shipped and invoice number. Attribute each data to its master system. In case of a negative return, the team must be able to retrieve the initial EDI message and then the invoice, even if both flows have passed through different providers. Ask for a demonstration that starts from the business file and another that leaves the message log.
Can a platform take back the logistics messages?
The scope varies according to the offer. Make the transport, mapping and operation of industrial messages separately.
Can we keep our existing business messages?
Map the order and logistics messages separately from the invoices affected by the reform, then confirm the continuity of each circuit.
Also to read
- Approved Platform , EDI, PEPPOL : how does an electronic invoice actually circulate?
- Externalized EDI solutions for ERP: comparative
- Electronic invoicing in industry: which platforms?
To check the status of an operator, see the Official list of DGFiP Approved Platforms.



